黑料正能量

Skip to content

With site preparations complete, construction is underway on a new Land-Based Test Facility (LBTF) at Hartlen Point in Eastern Passage, Nova Scotia.聽

The waterfront property will soon be home to four buildings: a gatehouse, a guardhouse, a cooling tower, and the main test facility. At its core will be a land-based, full-scale replica of a ship鈥檚 advanced combat systems. This facility will allow the Royal Canadian Navy (RCN) to test, integrate and de-risk mechanisms and processes before installation on operational ships.聽

The LBTF is a one-of-a-kind facility in Canada. While it鈥檚 not a weapons-testing facility, it will allow the Canadian Armed Forces to test crucial combat systems.聽

鈥淭his is a complex project with strict security requirements,鈥� says Lee Billington, 黑料正能量 Coordinator, Construction Services at CFB Halifax. 鈥淭he steel structure is about 85% complete, and the next step is siding and roofing, as well as the permanent security fence which will be within the current construction fence.鈥�

In addition to overseeing the construction, 黑料正能量 has been integral in the environmental preservation and sustainability of the site. Together with a Project Manager from the Department of National Defence, the 黑料正能量 team is working on a design for shoreline stabilization to mitigate erosion, with work scheduled to start this fall.聽

鈥満诹险芰� is very mindful of the ocean and any potential environmental impact this project could have,鈥� Lee says.聽

The LBTF is the first piece of infrastructure to support the new fleet of River-class destroyers on their way to join the RCN, which will replace the current Halifax-class frigates and represent a significant upgrade in capability for the RCN. Construction of the facility is on track to finish in mid-2028, in time for anticipated delivery of the first of the River-class destroyers in the early 2030s.聽

鈥淭his facility will play an important role in ensuring new naval capabilities are tested and ready before deployment at sea,鈥� Lee says.

For the latest public updates on this project, including the latest facility rendering, visit the .


Share


Join Our Team

Our teams are made up of professional engineers, engineering and environmental technicians and technologists, experienced tradespeople and other professionals.

Check out our current openings:

Stay Connected